Train service
Weekday departures: 58/day · Sat & holiday departures: 58/day
First / last train (weekday): 5:51 / 23:46
Busiest hour: 7:00–8:00 (5)
▂▅█▅▅▇▄▅▅▅▇▇▇▇▇▄▅▄▂
0:00 ─ 23:00
Counts are departures in the timetable data shown on our live map.
Adjacent stations
- JR Senseki Line: Rikuzen-Ono ⇄ Takagimachi
Location
History
Nobiru Station opened on 10 April 1928 as a station on the Miyagi Electric Railway, established by company president Yamamoto Toyoji to develop the calm-water Sunzaki-hama coast and the Oku-Matsushima area as a seaside resort. It was renamed Tōhoku-Suma in October 1931 in homage to Suma in Hyōgo Prefecture, then changed back to Nobiru when the line was nationalized on 1 May 1944. The station was destroyed by the tsunami of the 11 March 2011 Tōhoku earthquake. The relocated rebuilt station opened roughly 500 m inland on a 22 m high site on 30 May 2015.
Notes
The pre-tsunami station building was preserved and reopened on 1 October 2016 as the Higashi-Matsushima Earthquake Disaster Reconstruction Memorial Hall, with the ground floor used as an exhibition and exchange space and the second floor showing panels and video on the disaster.
Sources
Last updated: 2026-05-22